现代矿业 ›› 2013, Vol. 29 ›› Issue (02): 25-26+30.
• 采选工程 • 上一篇 下一篇
赵立智,任国义,董明礼,胡树伟
出版日期:
发布日期:
Zhao Lizhi,Ren Guoyi,Dong Mingli,Hu Shuwei
Online:
Published:
摘要: 为实现矿山经济效益的最大化,二道沟黄金矿业有限公司开展了重选—炭浆提金工艺替代重选—浮选提金工艺的研究,确定了氰化浸出的工艺技术条件,按试验确定的参数组织的工业试验结果表明,实验室试验结论可靠,可作为生产改造的依据。
关键词: 氰化浸出, 浮选, 浸出率
Abstract: To realize the maximization of economic benefits of mine, study of gravity separation-carbon-in-pulp gold extraction process replaced gravity separation-flotation gold extraction process was carried out in Erdaogou Gold Industry Co.,Ltd, technology conditions of cyanide leaching were confirmed, results of industrial test which organized according with test parameters indicates, conclusion of test in laboratory is reliable and could be the basis for change of productive practice.
Key words: Cyanide leaching, Flotation, Leaching rate
赵立智, 任国义, 董明礼, 胡树伟. 重选尾矿氰化浸出试验研究[J]. 现代矿业, 2013, 29(02): 25-26+30.
ZHAO Li-Zhi, REN Guo-Yi, DONG Ming-Li, HU Shu-Wei. Experimental Study on Cyanide Leaching to Tailings after Gravity Separation[J]. Modern Mining, 2013, 29(02): 25-26+30.
/ 推荐
导出引用管理器 EndNote|Ris|BibTeX
链接本文: https://www.xdky.net/CN/
https://www.xdky.net/CN/Y2013/V29/I02/25