现代矿业 ›› 2011, Vol. 27 ›› Issue (12): 9-11.
• 采选工程 • 上一篇 下一篇
李胜利,杜登峰,李春章,李兵
出版日期:
发布日期:
Li Shengli,Du Dengfeng,Li Chunzhang,Li Bing
Online:
Published:
摘要: 为了提高资源利用率和改变安全现状,通过进行6#矿体倾斜房柱式顶板滞后崩落采矿采矿法的试验研究,成功实现了6#矿体的安全高效回采,大幅度提高了回采率,延长了矿山服务年限;运用崩落法进行地压管理,消除了采空区安全隐患,改善了安全现状,保护了矿山地质环境,同时创造了巨大经济效益。
关键词: 房柱采矿法, 崩落采矿法, 回采率, 安全
Abstract: In order to increase resources utilization rate and change the security situation, through the experimental study of 6# ore inclined room and pillar mining methods roof delay caving mining, safe and efficient mining of 6# ore was realized successfully, mining rate was increased greatly, mine service life was prolonged;goaf hidden danger was eliminated, safety situation was improved, mine geological environment was protected and meanwhile great economic benefits was created by ground pressure management using caving method.
Key words: Room and pillar method, Caving mining, Mining rate, Safety
李胜利, 杜登峰, 李春章, 李兵. 双碑矿区倾斜6#石膏矿床采矿方法试验[J]. 现代矿业, 2011, 27(12): 9-11.
LI Sheng-Li, DU Deng-Feng, LI Chun-Zhang, LI Bing. Experiment of Inclined 6# Gypsum Deposit Mining Method of Shuangbei Mine[J]. Modern Mining, 2011, 27(12): 9-11.
/ 推荐
导出引用管理器 EndNote|Ris|BibTeX
链接本文: https://www.xdky.net/CN/
https://www.xdky.net/CN/Y2011/V27/I12/9