现代矿业 ›› 2011, Vol. 27 ›› Issue (12): 1-4.
• 采选工程 • 下一篇
邓飞,朱明,朱为民,刘晓军
出版日期:
发布日期:
Deng Fei,Zhu Ming,Zhu Weimin,Liu Xiaojun
Online:
Published:
摘要: 金属矿山合理建矿规模的确定,是矿山建设开发项目中的一个极其重要的决策。在分析影响某矿合理生产规模的主要因素基础上,利用层次分析法,确定各因素的权重及方案的优先次序,得出最优的建矿规模。
关键词: 生产规模, 影响因素, 层次分析法, 权重
Abstract: Confirmation of reasonable mine construction scale of metal mine is a extremely important decision in mine construction and development. On the basis of analysis of main factors which influence the reasonable production scale of a mine, confirmed the weights of each factors and the order of priority of schemes by using analytical hierarchy process, best mine construction scale was obtained.
Key words: Production scale, Influence factors, Analytical hierarchy process, Weights
邓飞, 朱明, 朱为民, 刘晓军. 基于层次分析法的某矿生产规模优选[J]. 现代矿业, 2011, 27(12): 1-4.
DENG Fei, ZHU Ming, ZHU Wei-Min, LIU Xiao-Jun. Optimization of Production Scale of a Mine based on Analytical Hierarchy Process[J]. Modern Mining, 2011, 27(12): 1-4.
/ 推荐
导出引用管理器 EndNote|Ris|BibTeX
链接本文: https://www.xdky.net/CN/
https://www.xdky.net/CN/Y2011/V27/I12/1