Welcome to Metal Mine! Today is Share:

Modern Mining ›› 2018, Vol. 34 ›› Issue (09): 197-198.

Previous Articles     Next Articles

Optimization of Production Blasting Hole Network in Luohe Iron Mine in Anhui Province

Chen Nengge1,Pan Zuying2,3,4   

  1. 1.Masteel Group Mining Co.,Ltd.;2.Sinosteel Maanshan Institute of Mining Research Co.,Ltd.;3.Maanshan Institute of Mining Research Blasting Engineering Co.,Ltd.; 4.State Key Laboratory of Safety and Health for Metal Mines;)
  • Online:2018-09-25 Published:2018-10-16

Abstract: The shortage of blasting technology in the production process of Luohe Iron Mine is analyzed,according to the the rock mechanics properties of the mine,the blasting parameters are optimized.The field test show that the single consumption of stope blasting explosive is reduced,the silt mine is reduced,the mass rate of the stage stope is obviously reduced and the cost of the direct ton mine of the fan hole perforation is reduced from 6.39 yuan/t in the early design to 5.05 yuan/t at present.

Key words: Hole network parameters, Mass rate, Parameter optimization