Journals included in China Core Journals ( Selection ) Database
Journals included in American Chemical Abstracts ( CA )
National Journal of Science and Technology Papers Statistics Source
Chinese academic journals full-text journals
Journals included in Wanfang database
Vip information included journals
Excellent journals in East China
The classification catalogue of high-quality scientific journals in the field of earth science of China Association for Science and Technology is T2 level.
China Association for Science and Technology high-quality scientific journals in the field of coal classification directory T2 level
The classification catalogue of high-quality scientific journals in the field of non-ferrous metals of China Association for Science and Technology is T3 level
Wechat

Modern Mining ›› 2014, Vol. 30 ›› Issue (07): 121-123.

Previous Articles     Next Articles

Computing on the Ventilation Economic Section of Mine Return Air Shaft

Cao Yongsheng1,Huang Shouyuan2,3,Wu Jiang1   

  1. 1.Dongguashan Copper Mine,Tongling Nonferrous Metals Group Holding Co.,Ltd.;2.Sinosteel Maanshan Institute of Mining Research Co.,Ltd.;3.State Key Laboratory of Safety and Health for Metal Mine
  • Online:2014-07-15 Published:2015-08-18

Abstract: In mine ventilation system,the large wind speed to determine the return air shaft section but ignore the ventilation energy consumption.So,the computational formula between ventilation economic section and the parameters of air volume and ventilation time from the perspective of lining,maintenance and electricity costs of the return air shaft.Taking a mine as an example,the ventilation economic section is computed by the formula based on the basic datas of air volume of return air shaft,tunneling lining and electricity so as to optimize the investment cost during the construction and operation of return air shaft.The return air shaft acreage is obtained by economic analyzing the results of the computational formula and the original design acreage.

Key words: Ventilation economic section, Optimize computation, Construction period, Operation period