Modern Mining ›› 2013, Vol. 29 ›› Issue (04): 34-37.
Previous Articles Next Articles
Dong Jie1,2,Li Shikai1
Online:
Published:
Abstract: Spray concrete for mine laneway was optimized with silica fume, while its process was as following: the content of silica fume was determined to 5% of quality of cement, silica fume solution of ratio of water to material 0.50 adopted to wet surface of crushed stone, then wet crushed stone mixed with cement first, then with sand. The site test result indicates that the rate of rebound decreases by one-third around, reduce range of dust concentration is between 20%~48%, compressive strength at 28 days increases 30% around. Through optimization, not only the spring-back and dust decrease, but also compressive strength of concrete improves. It has good guidance for the optimization of spray concrete for mine laneway.
Key words: Spray concrete, Silica fume, Rate of rebound, Dust concentration, Mine laneway
DONG Jie, LI Shi-Kai. Application Study of Optimization of Spray Concrete for Mine Laneway with Silica Fume[J]. Modern Mining, 2013, 29(04): 34-37.
/ Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: https://www.xdky.net/EN/
https://www.xdky.net/EN/Y2013/V29/I04/34