Welcome to Metal Mine! Today is Share:
×

扫码分享

Modern Mining ›› 2011, Vol. 27 ›› Issue (3): 4-5+58.

Previous Articles     Next Articles

Numerical Calculation Optimization of Stope Structural Parameters under Highway Phosphorite Mining

Song Yuanbing   

  1. Mine Company of Guizhou Kailin Group
  • Online:2011-03-08 Published:2011-03-10

Abstract: Partial orebody of Yongshaba mine of Guizhou Kailin Group located below Jinyang highway which the amount reaches to 22 620 000 ton. Room and pillar type medium-length hole fall ore afterwards cementation filling mining method based on the test and analysis of mechanics parameters are done on ore-rock. Meanwhile, stope structural parameters are selected by numerical calculation method, and safe exploitation of phosphorite under highway is realized.

Key words: merical calculation method, and safe exploitation of phosphorite under highway is realized.
Keywords:    ,
Under highway mining, Room and pillar type medium-length hole fall ore afterwards cementation filling mining method, Numerical calculation, Stope structural parameters