软岩巷道锚索预应力损失机理及精准防控技术研究

孟嘉彬1 郭 磊2 汪占领2 杨 军1 王晓辉1 王浩龙1 顾龙泉1 马德义1   

  1. 1. 窑街煤电集团酒泉天宝煤业有限公司;2. 天地科技股份有限公司
  • 出版日期:2026-09-25 发布日期:2026-10-10

Research on Prestress Loss Mechanism and Precise Prevention and Control Technology of Anchor Cable in Soft Rock Roadway

MENG Jiabin1 GUO Lei2 WANG Zhanling2 YANG Jun1 WANG Xiaohui1 WANG Haolong1 GU Longquan1 MA Deyi1   

  1. 1. Jiuquan Tianbao Coal Industry Co.,Ltd.,Yaojie Coal and Electricity Group; 2. Tiandi Science and Technology Co.,Ltd.
  • Online:2026-09-25 Published:2026-10-10

摘要: 针对软岩巷道锚索预应力衰减快及支护稳定性差的工程难题,以红沙梁井工矿浅埋软 岩巷道为工程背景,采用理论分析与现场工业试验相结合的方法,系统开展锚索预应力损失机理及 防控技术研究。结果表明:软岩巷道锚索预应力损失受锚索材料、张拉设备、施工工艺、围岩蠕变、水 环境变化等多重因素耦合影响,其全过程可划分为快速下降、稳步下降、基本平稳3个阶段。基于损 失机理,提出更换低松弛注浆锚索、标定张拉机具、二次补偿张拉、围岩注浆加固等综合防控措施。 现场试验表明:相较于普通锚索,注浆锚索预应力平均损失率降低24.30%;张拉机具老化会使预应力 损失率提升32.37%,定期标定可有效规避设备损耗影响;锚索二次张拉工艺平均预应力补偿率可达 27.51%。整套控制措施可显著抑制软岩巷道锚索预应力损失,改善围岩支护耦合效果,保障巷道围 岩稳定。该研究成果可为同类软岩矿井锚索支护优化及预应力损失防控提供工程参考。

关键词: 软岩巷道 注浆锚索, 预应力损失, 蠕变, 围岩支护

Abstract: In view of the engineering problems of fast attenuation of anchor cable prestress and poor support stability in soft rock roadway,taking the shallow buried soft rock roadway in Hongshaliang Mine as the engineering background,the method of combining theoretical analysis with field industrial test is used to systematically carry out the research on the mechanism and prevention and control technology of anchor ca⁃ ble prestress loss. The results show that the prestress loss of anchor cable in soft rock roadway is affected by the coupling of multiple factors such as anchor cable material,tensioning equipment,construction technolo⁃ gy,surrounding rock creep and water environment change. The whole process can be divided into three stag⁃ es of rapid decline,steady decline and basically stable. Based on the loss mechanism,comprehensive pre⁃ vention and control measures such as replacing low-relaxation grouting anchor cables,calibrating tension⁃ ing tools,secondary compensation tensioning,and surrounding rock grouting reinforcement are proposed. The field test shows that the average loss rate of prestress of grouting anchor cable is reduced by 24.30% compared with that of ordinary anchor cable. The aging of the tensioning machine will increase the prestress loss rate by 32.37%. Regular calibration can effectively avoid the influence of equipment loss. The average prestress compensation rate of the secondary tensioning process of the anchor cable can reach 27.51%. The whole set of control measures can significantly inhibit the prestress loss of anchor cable in soft rock road⁃way,improve the coupling effect of surrounding rock support,and ensure the stability of surrounding rock of roadway. The research results can provide engineering reference for anchor cable support optimization and prestress loss prevention and control in similar soft rock mines.

Key words: soft rock roadway, grouting anchor, prestress loss, creep, surrounding rock supporting