摘要: 为解决厄瓜多尔米拉多露天铜矿岩性复杂多变、爆破块度控制困难的问题,基于岩 体可爆性分级,开展了 4种典型岩体的延期时间优化现场试验研究,确定了不同岩性区域的合理延 期时间参数。研究结果表明:基于 RMR 分级系统,花岗闪长岩可爆性等级为Ⅱ级,花岗闪长斑岩 和石英砂岩为Ⅲ级,角砾岩为Ⅳ级;花岗闪长岩对延时调整响应微弱,花岗闪长斑岩缩短孔间延 时后破碎效果降低,2 类岩体均宜维持 42 ms+65 ms 常规方案。石英砂岩采用“双孔同响”方案后, 大块形状由“饼状”转变为规整方形,破碎均匀性显著改善。角砾岩采用 25 ms+42 ms 方案并配合 600 ms 孔内雷管后,500 mm 以上大块完全消除,块度主要集中于 150~500 mm。使用试验确定的延 期参数,能有效改善不同岩性区域的爆破破碎效果,为复杂岩性矿山精细化爆破设计提供了理论 依据与工程指导。

关键词: 露天矿山, 台阶爆破, 可爆性分级, 延期时间

Abstract: To address the problems of complex and variable lithology and difficult blasting fragmenta⁃ tion control at the Mirador Open-pit Copper Mine in Ecuador,field tests on delay time optimization were carried out for four typical rock masses based on rock mass blastability classification,and reasonable delay time parameters for different lithological zones were determined. The results show that according to the RMR classification system,granodiorite has a blastability grade of Class II,granodiorite porphyry and quartz sandstone are Class III,and breccia is Class IV. Granodiorite exhibits a weak response to delay ad⁃ justment,and shortening the inter hole delay time of granodiorite porphyry leads to a poorer fragmentation effect; therefore,the conventional scheme of 42 ms + 65 ms is recommended for both rock types. After adopting the“dual hole simultaneous initiation”scheme for quartz sandstone,the shape of large boulders changes from“pie type”to regular square,and the fragmentation uniformity is significantly improved. For breccia,using 25 ms + 42 ms combined with 600 ms in hole detonators completely eliminates boulders larger than 500 mm,and the fragment size is mainly concentrated in the range of 150~500 mm. The delay parameters determined by the tests can effectively improve the blasting fragmentation effect in different lith⁃ ological zones,providing a theoretical basis and engineering guidance for refined blasting design in mines with complex lithology.

Key words: open-pit mine, bench blasting, blastability classification, delay time