破碎构造带下露天采场滑坡机理及处治方案研究与应用

朱自强 刘 超 杨懿全 代俊成 吴毓萌 刘雷斌   

  1. 北方矿业有限责任公司
  • 出版日期:2026-04-25 发布日期:2026-05-26

Research and Application of the Mechanism and Treatment Plan of Open-pit Mine Landslide in the Fractured Structural Zone

ZHU Ziqiang LIU Chao YANG Yiquan DAI Juncheng WU Yumeng LIU Leibin   

  1. Norin Mining Co.,Ltd.
  • Online:2026-04-25 Published:2026-05-26

摘要: 以刚果(金)某露天采场滑坡为对象,系统分析了露天采场滑坡的成因与机理,并基 于极限平衡分析法和二维有限元分析法,对现存滑坡体进行了稳定性评估,同时提出“削坡减载+ 截排水+防渗”综合处治方案并进行了现场治理。研究结果表明:边坡滑塌是多重致灾因素综合作 用的结果,主要包括地质结构破碎、岩性软弱及雨季渗流等因素。边坡破坏过程整体呈现局部垮 塌—牵引式滑动—推移式滑移的复合型破坏模式。下部台阶局部垮塌引发上部台阶发生牵引式 滑坡破坏,而垮塌产生的堆积滑坡体对下部平台产生了较大的推力,致使下部平台产生推移式滑 坡破坏,从而导致滑坡灾害的产生。基于Slide 及Phase 数值模拟结果,边坡治理前的安全系数接近 临界状态,具有潜在不稳定性,亟需开展边坡治理。采取“削坡减载+截排水+防渗”综合处治方案, 对东部滑坡体进行施工治理,经过雨季和旱季的长期观测,治理后的边坡稳定性良好,表明治理方 案切实有效。研究成果可为刚果(金)及类似地质条件下露天采场滑坡灾害治理提供科学依据与 工程参考价值。

关键词: 破碎构造带, 露天采场, 滑坡机理, 稳定性处治方案

Abstract: A landslide in a certain open-pit mine in the Democratic Republic of the Congo was se ⁃ lected as the object of the study.The research systemically analyzed the causes and mechanisms of the landslide on the open-pit slope,and based on the limit equilibrium analysis method and 2D finite element analysis method,the stability of the existing landslide body was evaluated.At the same time,a comprehen⁃ sive treatment plan of "slope cutting and load reduction +interception drainage +anti-seepage"was pro ⁃ posed and implemented on-site for treatment.The research results show that the slope collapse is the result of the combined action of multiple disaster-causing factors,mainly including geological structure fragmen ⁃ tation,weak rock quality,and rainfall-induced seepage,etc.The overall slope failure process presents a composite failure mode of local collapse -traction-type sliding -push-type sliding.Local collapse of the lower step triggers traction-type landslide failure of the upper step,and the accumulated landslide body generated by the collapse exerts a large thrust on the lower platform,causing push-type landslide failure of the lower platform,thereby leading to the occurrence of landslide disasters.Based on the numerical simula⁃ tion results of Slide and Phase,before the treatment,the safety factor of the slope was close to the critical state,and there was potential instability,urgently requiring slope treatment.The "slope cutting and load reduction +interception drainage +anti-seepage"comprehensive treatment plan was adopted to conduct construction treatment on the eastern landslide body.After long-term observation during the rainy and dry seasons,the stability of the treated slope was good,indicating that the treatment plan was truly effective. The research results can provide scientific basis and engineering reference value for the treatment of open pit mine landslide disasters in the Democratic Republic of the Congo and similar geological conditions.

Key words: fractured structuralbelt, open-pit mine, landslide mechanism, stability, treatment scheme