低成本高效光面爆破在井巷掘进中的研究与应用

李洪兵 卢国旭 耿 浩 王建杰 张金鹏 李海东   

  1. 内蒙古玉龙矿业股份有限公司
  • 出版日期:2026-04-25 发布日期:2026-05-22

Research and Application of Low-cost and Efficient Smooth Blasting in Tunnel Excavation

  1. Inner Mongolia Yulong Mining Co.,Ltd.
  • Online:2026-04-25 Published:2026-05-22

摘要: 为解决中小型地下矿山因巷道断面狭小、地质条件复杂而难以采用传统光面爆破 (需全孔敷设竹片与导爆索,成本高,工序繁)的问题,以内蒙古花敖包特银铅矿为工程背景,提出 无需竹片与导爆索的低成本高效光面爆破技术。通过理论分析与大量工业试验,优化光爆孔装 药结构,合理设计光爆层厚度(625 mm)、孔间距(500 mm)及线装药密度(150 g/m),并充分利用 ϕ32 mm 乳化炸药在4 .0 m 深孔中的最大稳定殉爆距离(1 050 mm),采用三段式空气间隔分装结构 配合孔口堵塞。工程应用结果表明:该方法成功取消了竹片与导爆索,单循环作业时间缩短1.8 h, 劳动强度降低37%,爆破直接成本降低50%(节约235 元/m);巷道半孔成型率提升至92%以上,轮 廓超欠挖控制在±10 cm 以内,围岩损伤深度减少35%,支护工程量缩减22%,成型质量达到行业领 先水平。该技术工艺简化、成本低廉、效果稳定,为中小型矿山提供了一套可复制、易推广的绿色 高效光面爆破解决方案。

关键词: 地下矿山, 光面爆破, 井巷掘进, 殉爆距离, 装药结构

Abstract: In order to solve the problem that it's difficul to adopt traditional smooth blasting(requir⁃ ing the full-hole installation of bamboo strips and detonating cords,which is costly and involves complicat⁃ ed procedures)in small and medium-sized underground mines,due to their narrow tunnel sections and complex geological conditions,based on the engineering background of the Huaaobaote Ag-Pb Mine in In ⁃ ner Mongolia,low-cost and efficient smooth blasting technology without bamboo strips and detonating cords is proposed.Through theoretical analysis and numerous industrial tests,the explosive loading struc⁃ ture of the smooth blasting holes is optimized,the thickness of the smooth blasting layer(625 mm),the hole spacing(500 mm),and the line explosive density(150 g/m)are reasonably designed,and the maxi⁃ mum stable detonation distance of ϕ32 mm emulsion explosives in 4.0 m deep holes(1 050 mm)are fully utilized.A three-stage air interval filling structure combined with hole mouth blocking is adopted.The en⁃ gineering application results show that this method successfully eliminates bamboo strips and detonating cords,reducing the single-cycle operation time by 1.8 h,lowering labor intensity by 37%,and reducing the direct blasting cost by 50%(saving 235 RMB/m);the semi-hole formation rate of the tunnel increases to over 92%,the contour over-cutings and under-cuttings are controlled within ±10 cm,the damage depth of the surrounding rock is reduced by 35%,the support engineering volume is reduced by 22%,and the formation quality reaches the leading level in the industry.This technology simplifies the process,is low in cost,and has stable effects,providing a replicable and easily-promoted green and efficient smooth blasting solution for small and medium-sized mines.

Key words: underground mine, smooth blasting, tunnel excavation, detonation gap distance, charge structure