现代矿业 ›› 2026, Vol. 42 ›› Issue (03): 221-227.

• 安全·环保 • 上一篇    下一篇

某企业选矿环水水质净化提升路径研究

王玉洁1 罗瑞玲2 王瑾瑄1   

  1. 1. 南京宝地梅山产城发展有限公司矿业分公司;2. 南京理工大学环境与生物工程学院
  • 出版日期:2026-03-25 发布日期:2026-04-20

Research on the Improvement Path of Water Quality Purification of Beneficiation Circulating Water in an Enterprise

  1. 1. Mining Branch of Nanjing Baodi Meishan Industrial City Development Co.,Ltd.; 2. School of Environmental and Biological Engineering,Nanjing University of Science and Technology
  • Online:2026-03-25 Published:2026-04-20

摘要: 某企业为保障出水水质稳定达标,解决选矿环水总氮超标的问题,针对现有污水处 理站工艺缺乏脱氮功能、砂滤池滤料板结等问题,结合选矿环水水质特征与场地条件,开展了水质 净化提升路径研究,通过现状调研、水质分析、工艺比选、方案设计及成本效益评估等方法,确定采 用二级 AO 工艺对现有调节池进行改造,采用格栅→二级 AO 池→混凝沉淀池→砂滤池→清水池的 处理流程,配套新增碳源投加、曝气、回流等系统,设计处理规模 2 000 m3 /d。研究结果表明:改造 后总氮去除率达 94%,COD 去除率 75%,悬浮物去除率 92%,出水水质满足《铁矿采选工业污染物 排放标准》(GB28661—2012)及企业内控要求,项目总投资 134.62万元,新增水运行成本 1.444元/t, 二级 AO 工艺适配企业高脱氮需求与用地限制,改造方案技术可行且经济合理,能有效解决总氮超 标的问题,兼具环境、社会与经济效益,可为同类选矿企业废水处理提供参考。

关键词: 选矿环水, 总氮去除, 二级AO, 工艺, 工艺改造, 水质净化

Abstract: In order to ensure that the effluent quality is stable and up to standard and solve the prob‐ lem of excessive total nitrogen in the circulating water of mineral processing,an enterprise carries out a study on the improvement path of water quality purification in combination with the water quality character‐ istics and site conditions of the circulating water of mineral processing,aiming at the problems such as the lack of nitrogen removal function and the hardening of the filter material in the sand filter in the existing sewage treatment station. Through the methods of current situation investigation,water quality analysis, process comparison,scheme design and cost-benefit evaluation,it is determined that the two-stage AO pro‐ cess is used to transform the existing regulating tank. The treatment process of grid → two-stage AO tank → coagulation sedimentation tank → sand filter → clear water tank is adopted,and the new carbon source dosing,aeration,reflux and other systems are added. The design treatment scale is 2 000 m3 /d.The results show that the total nitrogen removal rate is 94%,COD removal rate is 75% and suspended solids re‐ moval rate is 92% after the transformation. The effluent quality meets the Discharge Standard of Pollutants for Iron Ore Mining and Dressing Industry(GB28661-2012)and enterprise internal control requirements. The total investment of the project is 1.346 2 million yuan,and the new water operation cost is 1.444 yuan/t. The secondary AO process is suitable for the high nitrogen removal demand and land restriction of the en‐ terprise.The transformation scheme is technically feasible and economically reasonable,which can effec‐ tively solve the problem of total nitrogen exceeding the standard,and has environmental,social and eco‐ nomic benefits. It can provide reference for wastewater treatment of similar mineral processing enterprises.

Key words: circulating water of mineral processing, total nitrogen removal, secondary AO process, process transformation, water purification