欢迎访问《现代矿业》杂志官方网站,今天是 分享到:
×

扫码分享

现代矿业 ›› 2026, Vol. 42 ›› Issue (03): 33-37.

• 采矿工程 • 上一篇    下一篇

露天转地下阶段铜山口铜矿采场稳定性研究

张 华1 杨晓声1 罗傲春1 刘 冲1 刘春康2 杨国立2 王建栋2   

  1. 1. 大冶有色金属有限责任公司铜山口铜矿;2. 北京科技大学资源与安全工程学院
  • 出版日期:2026-03-25 发布日期:2026-04-07

Study on the Stability of Tongshankou Copper Mine in the Stage of Open-pit to Underground

ZHANG Hua1 YANG Xiaosheng1 LUO Aochun1 LIU Chong1 LIU Chunkang2 YANG Guoli2 WANG Jiandong2   

  1. 1. Tongshankou Copper Mine,Daye Nonferrous Metals Co.,Ltd.; 2. School of Resources and Safety Engineering,University of Science and Technology Beijing
  • Online:2026-03-25 Published:2026-04-07

摘要: 以铜山口铜矿露天转地下过渡阶段的Ⅰ号、Ⅵ号矿体采场为研究对象,针对该阶段 工程地质环境剧变,采场稳定性面临挑战的问题,围绕采场稳定性开展研究,为矿山采场设计、支 护优化及安全生产提供理论支撑。通过岩石力学试验与工程地质测试,获取斑岩、矽卡岩等多种 矿岩的物理力学参数及工程地质特征;采用 RMR 法与 Q 分类法评价矿岩质量,结果显示Ⅰ号矿体 斑岩、大理岩质量优良,为Ⅱ级岩体,矽卡岩为Ⅲ级;Ⅵ号矿体斑岩质量较差,为Ⅲ级岩体,且 RQD 值仅 30%,呈中风化状态,是稳定性薄弱环节。结合 Mathews稳定性图表法及 Q 系统经验公式分析 采场暴露面稳定性,确定关键参数,其中Ⅰ号矿体部位无支护安全跨度 12.36~15.45 m,Ⅵ号矿体安 全跨度为 9.49~11.86 m。研究表明,Ⅰ号矿体采场整体稳定,可采用接近 15m 跨度无支护或弱支护 开采;Ⅵ号矿体需严格控制采场参数并采取主动支护。研究构建的“评价—分析—设计”一体化技 术路线,解决了矿山实际问题,也为同类矿山转型提供参考。

关键词: 露天转地下, 采场稳定性, 岩石力学试验, 矿体质量评价

Abstract: Taking the stopes of No.I and No.VI ore bodies in the transition stage from open-pit to un‐ derground in Tongshankou Copper Mine as the research object,in view of the drastic changes of engineer‐ ing geological environment and the challenges of stope stability in this stage,the research on stope stability is carried out to provide theoretical support for mine stope design,support optimization and safe produc‐ tion. Through rock mechanics test and engineering geological test,the physical and mechanical parameters and engineering geological characteristics of various ore rocks such as porphyry and skarn are obtained. The quality of ore rock is evaluated by RMR method and Q classification method. The results show that the quality of porphyry and marble in No.I ore body is excellent,which is Grade II rock mass,and skarn is Grade III. The porphyry quality of the No.VI orebody is poor,which is a Grade III rock mass,and the RQD value is only 30 %,which is in a medium weathering state,which is a weak link in stability. Com‐ bined with Mathews stability chart method and Q system empirical formula,the stability of stope exposed surface is analyzed,and the key parameters are determined. The safety span of No.I orebody without sup‐ port is 12.36~15.45 m,and that of No.VI orebody is 9.49~11.86 m. The research shows that the stope of No. I ore body is stable as a whole,and the mining without support or weak support with a span of nearly 15 m can be adopted. The VI ore body needs to strictly control the stope parameters and take active support. The integrated technical route of 'evaluation-analysis-design' constructed in this study solves the practical problems of mines and provides reference for the transformation of similar mines.

Key words: open-pit to underground, stope stability, rock mechanics test, quality evaluation of orebody