安徽姑山露天采场开采挂帮矿三步骤回采方案设计
杨剑1,杨家冕2,3,4,尹裕2,3,4,刘允秋2,3,4*
1.马钢(集团)控股有限公司桃冲矿业公司;2.中钢集团马鞍山矿山研究院有限公司;3.金属矿山安全与健康国家重点实验室;4.华唯金属矿产资源高效循环利用国家工程研究中心有限公司
Design of Three-step Stoping Scheme of the Hanging Wall Ore of Gushan Open-pit Stope of Anhui Province
Yang Jian1,Yang Jiamian2,3,4,Yin Yu2,3,4,Liu Yunqiu2,3,4*
1.Taochong Mining Co.,Ltd.,MasteelGroup) Holding Co.,Ltd.;2.Sinosteel Maanshan Institute of Mining Research Co.,Ltd.;3.State Key Laboratory of Safety and Health for Metal Mines; 4.Huawei National Engineering Research Center of High Efficient Cyclic and Utilization of Metallic Mineral Resources Co.,Ltd.

摘要
参考文献
相关文章
Download: PDF (0KB)   HTML 1KB   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 根据姑山露天采场挂帮矿开采技术条件及现场实际,提出了适用于该矿三步骤回采的技术方案。通过参考类似矿山经验,设计了2组可行的开采技术方案,并采用数值模拟方法分析了其安全性。通过2种方案的模拟分析比较,选用了合理的回采方案,安全回收了采场东北部的1#和2#穿脉联巷的矿体,回收率达到了60%,贫化率达到了8%,取得了预期效果。 
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
杨剑
杨家冕
尹裕
刘允秋
关键词挂帮矿   露天转地下开采   三步骤回采   数值模拟   回采方案     
Abstract: According to the mining technical conditions and actual situations of the hanging wall ore of Gushan Open-pit Stope,three-step stoping technical scheme is proposed.By referring to the experiences of the similar mines,the two feasible mining technical schemes are designed,and the safety of them are analyzed by adopting numerical simulation method.Through comparison of the two mining schemes,the optimal one is selected,the orebodies in 1# and 2# ore vein roadway in the northeast of the stope are recovered effectively and safety,the ore recovery rate is 60%,ore dilution rate is 8%,the desired effects is obtained.
KeywordsHanging wall ore   Open-pit to underground mining   Three-step stoping   Numerical simulation   Stoping scheme     
引用本文:   
杨剑, 杨家冕, 尹裕, 刘允秋.安徽姑山露天采场开采挂帮矿三步骤回采方案设计[J]  现代矿业, 2018,V34(11): 59-61
YANG Jian, YANG Jia-Mian, YIN Yu, LIU Yun-Qiu.Design of Three-step Stoping Scheme of the Hanging Wall Ore of Gushan Open-pit Stope of Anhui Province[J]  Modern Mining, 2018,V34(11): 59-61
链接本文:  
http://118.145.15.232/Jweb_xdky//CN/      或     http://118.145.15.232/Jweb_xdky//CN/Y2018/V34/I11/59
Copyright 2010 by 现代矿业