刘楼铁矿采矿方案优化探析

范进红   

  1. 南京明达矿业有限公司
  • 出版日期:2013-11-15 发布日期:2014-04-08

Analysis on the Mining Scheme of Liulou Iron Mine

Fan Jinhong   

  1. Nanjing Mingda Mining Co.,Ltd.
  • Online:2013-11-15 Published:2014-04-08

摘要: 通过对浅孔留矿法与充填采矿法适应性对比分析,分析了上向分层与分层进路采矿法在刘楼矿实行的必要性,系统阐述了进路分层充填法的实施方案、分层充填法回收矿柱实施工艺及存在的主要问题和改进措施,克服了浅孔留矿法采矿作业中的安全难题,消除了采空区危害,提高了回采率,降低了贫化率,使矿产资源得到充分有效回收。

关键词: 上向分层进路充填法, 上向分层充填法, 矿柱回收, 回采率, 贫化率

Abstract: The adaptive of short-hole shrinkage mining method and mining method employing fill are contrastive analyzed.The necessity application of approach cut-and-fill stoping method and upward layer filling method in Liulou iron mine is analyzed in detail.The scheme of layer filling method,the technology of recycling pillar of layer filling mthod,some relative main problms and improvement measures are discussed so as to deal with the safety problem of approach cut-and-fill stoping method,eliminate the risks in the mined-out area,improve the recovery rate,reduce the dilution rate,make the mineral resources be recoveried effectively.

Key words: Approach cut-and-fill stoping, Upward layer filling method, Recovery of the mine pillar, Recovery rate, Dilution rate