欢迎访问《现代矿业》杂志官方网站,今天是 分享到:

现代矿业 ›› 2020, Vol. 36 ›› Issue (07): 27-31.

• 采矿工程 • 上一篇    下一篇

某露天矿汽车转汽车—胶带排岩运输系统最佳时空衔接研究

孙永茂 张强   

  1. 安徽马钢张庄矿业有限责任公司
  • 出版日期:2020-07-25 发布日期:2021-09-19

Research on Optimal Timespace Connection of Automobiletoautomotive Beltdischarge Rock Transportation System in an Openpit Mine

Sun Yongmao Zhang Qiang   

  1. Anhui Masteel ZhangZhuang Mining Co.,Ltd.
  • Online:2020-07-25 Published:2021-09-19

摘要: 我国大中型冶金露天矿山都已进入中后期开采,逐渐由浅部转入深部,并且大多数的开拓运输方式都以汽车运输为主,将面临着运距长、汽车效率低下、运营成本高等相关问题,制约着矿山企业的发展。为探讨某露天矿汽车转汽车—胶带排岩运输系统最佳时空衔接,结合国内某大型露天矿排岩运输系统的现状,根据矿山企业已经编制好的排岩进度计划,建立2种运输系统年排岩运营成本模型,借鉴类似矿山胶带运输系统的排岩成本,算出2种排岩运输系统的排岩成本,然后利用有无项目对比的方法,建立增量投资盈利指标数学模型,分别求出每种情况的增量投资盈利指标,将所得数据列于同一表格并通过对比找出增量投资盈利指标最大值,该最大值点就是所求的汽车转汽车—胶带排岩运输系统最佳时空衔接点。

关键词: 露天矿 排岩进度计划 有无项目对比法 盈利指标 时空衔接点

Abstract: China's large and mediumsized metallurgical openpit mines have entered the middle and late stages of mining,and gradually moved from shallow to deep.Most of the pioneering transportation methods are mainly based on automobile transportation.They will face long distances,low vehicle efficiency,and high operating costs.Restricting the development of mining enterprises.In order to explore the best spatiotemporal connection of an automobiletoautomotive beltdischarge rock removal transport system in an openpit mine,combined with the current status of a largescale openpit mine rock removal transport system in China,based on the rock formation schedule prepared by the mining enterprise,two types of transportation systems have been established the model of the cost of rock rowing operation draws on the rock rowing costs of similar mine belt transportation systems,calculates the rock rowing costs of the two rock rowing systems,and then uses the method of comparing projects with or without to establish a mathematical model of incremental investment profit indicators,which are obtained separately.Incremental investment profit indicators for each case,the obtained data are listed in the same table and the maximum value of incremental investment profitability indicators is found through comparison.The maximum point is the optimal time and space of automobiletoautomotive beltdischarge rock transportation system.

Key words: Openpit mine,Schedule of rock formation,Project comparison method, Profit index,Timespace connection point