Welcome to Metal Mine! Today is Share:
×

扫码分享

Modern Mining ›› 2020, Vol. 36 ›› Issue (10): 46-.

Previous Articles     Next Articles

Optimization of Blasting Parameters in Waterbearing Area of Barun Iron Mine

GUO Yi′na1GUO Jianxin 2   

  1. 1.Baotou Steel Group Mining Research Institute (Limited Liability Company2.Barun Mining Branch of
    Inner Mongolia Baotou Steel Union Co.,Ltd.
  • Online:2020-10-25 Published:2021-09-24

Abstract: Presplitting blasting is a commonly used technology in metal mine,which can weaken the rupture of surrounding rock,weaken the destructive effect of blasting vibration on the slope of openpit mine,and maintain the stability of slope.In order to solve the problem of poor effect of presplitting blasting in water bearing area of Barun Iron Mine,based on the field geological survey and theoretical analysis,the optimization study of presplitting blasting parameters in water bearing area of Barun iron mine is carried out,and the ideal hole network parameters are obtained.The blasting effect is very ideal,which ensures the stability of the slope,and provides strong support for the presplitting blasting in the water bearing area of the mine.