Abstract: In order to solve the problem that the straight wall semicircular arch section of Mindong No.1 Mine has a slow boring speed and cannot be used with the excavating and anchoring machine,it is urgent to modify the roadway section design to rectangular.Based on the geological conditions of I0216301 transporting thick soft coal along the trough,the elastoplastic method,pressure arch method,field measurement and numerical simulation were used to determine the maximum damage range of the roof when the rectangular section was used,which were 2.53 m,2.87 m,2.40 m,and 2.45 m,finally taking the pressure arch calculation data as a reference,considering 2 times the safety factor,it is proposed to use "19 core 17.8×8 300 mm anchor cable+20×2 500 mm lefthanded and other strong rebar steel anchor+metal mesh+steel belt "Support plan for joint support.
Key words: Rectangle, Numerical simulation, Pressure arch, Soft rock
Shao Li. Design of Support Parameters for Thick Rock Softrock Roadway in Mindong No.1 Mine[J]. Modern Mining, 2020, 36(07): 73-75.
/ Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: https://www.xdky.net/EN/
https://www.xdky.net/EN/Y2020/V36/I07/73