欢迎访问《现代矿业》杂志官方网站,今天是 分享到:

现代矿业 ›› 2023, Vol. 39 ›› Issue (4): 39-.

• 采矿工程 • 上一篇    下一篇

崩落岩石侧压力作用下隔离矿柱宽度研究

谭富生   

  1. 紫金(长沙)工程技术有限公司
  • 出版日期:2023-04-25 发布日期:2023-05-25

Study on the Width of Isolated Pillar under the Lateral Pressure of Caving Rock

TAN Fusheng   

  1. Zijin ( Changsha ) Engineering Technology Co.,Ltd.
  • Online:2023-04-25 Published:2023-05-25

摘要: 为确定在崩落岩石侧压力作用下隔离矿柱的宽度,采用FLAC3D模拟计算了5 种不同 宽度隔离矿柱的稳定性。结果表明:在侧压力作用下,隔离矿柱底部位置有明显的应力集中,空区 侧的拉应力和水平位移明显大于二步骤矿柱;隔离矿柱的应力和水平位移随着宽度的增加而减 小,确保隔离矿柱稳定的临界宽度为15 m。考虑受地质因素和爆破振动的影响,推荐矿山留设隔 离矿柱宽度为20 m。

关键词: 隔离矿柱, 崩落岩石, 侧压力, 空场法

Abstract: In order to determine the width of the isolated pillar under the lateral pressure of the caving rock,FLAC3D was used to simulate the stability of five different widths of isolated pillars.Under the action of lateral pressure,there is obvious stress concentration at the bottom of the isolated pillar,and the tensile stress and horizontal displacement on the side of the goaf are significantly greater than those of the twostep pillar.The stress and horizontal displacement of the isolated pillar decrease with the increase of the width,and the critical width to ensure the stability of the isolated pillar is 15 m.Considering the influence of geological factors and blasting vibration,it is recommended that the width of isolated pillar should be 20 m.

Key words: isolated pillar, caving rock, lateral pressure, open stope method