Optimization Research and Application of Top Layered Detonation Charging Parameters for Platform Blasting in Dabaoshan Open-pit Mine

ZHAO Xing1 SUN Qingfu1 CAO Mingyu1,2 CAO Jiangshan2 SHEN Wenbo2 QIU Xianyang2   

  1. 1. Guangdong Dabaoshan Mining Co.,Ltd.;2. School of Resources and Safety Engineering, Central South University
  • Online:2026-08-25 Published:2026-08-20

Abstract: In response to the problem of excessive length of blocked sections in the blasting of the open-pit mining platform of Dabaoshan,which leads to insufficient energy release at the top and high rate of large blocks,a field study on top layer detonation charge was conducted. A single-hole mechanism iden⁃ tification was carried out on the expansion mining platform 661,and a 75 holes group comparison was con⁃ ducted on the east slope platform 637. A layer detonation charge design was carried out and the top blocked length (5.5,4.0,3.5 m) was compared. Under the condition of maintaining the total charge amount basically unchanged and micro-differential initiation of each hole,the effect was evaluated by block size statistics. The results show that in the single-hole test,D50 decreased from 616 mm to 485 mm, D80 decreased from 947 mm to 834 mm,Dmax decreased from 2 074 mm to 1 443 mm,and the rate of large blocks greater than 1 m decreased from 15.2% to 6.1%. In the group comparison,the layer detonation charge + top blocked length of 3.5 m achieved the optimal and stable crushing effect,and the rate of large blocks decreased by 72% compared with the continuous detonation charge structure,while the blasting ef⁃ fect of the scheme with top blocked length of 4.0 m did not improve significantly. From the experiments,it can be known that without increasing the charge amount,top layered detonation charge can achieve energy and time-space redistribution,significantly improving surface crushing and pile shape. The blocked length is the key control quantity. Under the given rock properties and hole network conditions,3.5 m is the pre⁃ferred value. An excessively long blocked length is likely to cause insufficient energy release at the top,re⁃ sulting in incomplete top crushing.

Key words: blasting of the open-pit mining platform, deep-hole blasting, charging structure, layer detonation charge