Study on Roadway Repair Time and Open-off Cut Position Under Upward Mining Conditions

In order to avoid the problem of repeated repair of roadways in the upper mining area during
coal mining,the failure characteristics of overlying strata and the evolution characteristics of plastic zone of
roadways in the mining process of underlying coal seams were studied by means of theoretical analysis,nu⁃
merical simulation and engineering measurement. The research reveals the influence of underlying coal
seam mining on coal seam integrity and roadway stability,and determines the repair time of upper coal seam
roadway and the reasonable position of open-off cut of lower coal seam working face. During the mining peri⁃
od of the coal mine,due to the influence of the mining of the underlying coal seam working face,the plastic
damage of the upper mining rock layer is serious. Although there is no step error,there is overall subsid⁃
ence. The repair time of the upper coal seam roadway should be after the plastic zone tends to be stable. The
repair time of the upper coal seam roadway should be obvious in the plastic zone,that is,the initial stage of
severe deformation of the surrounding rock. The position of open-off cut should consider the minimum defor⁃
mation of surrounding rock and the full utilization of coal resources. The field engineering application shows
that after taking the above measures,the deformation of roadway surrounding rock meets the requirements of
coal mine production,and the multiple repairs of roadway surrounding rock deformation are avoided.
  

  1. Shouyang Hengyuan Coal Industry Co.,Ltd.,Shanxi Coal Transportation and Sales Group
  • Online:2024-06-17 Published:2024-08-06

Abstract:

In order to avoid the problem of repeated repair of roadways in the upper mining area during
coal mining,the failure characteristics of overlying strata and the evolution characteristics of plastic zone of
roadways in the mining process of underlying coal seams were studied by means of theoretical analysis,nu⁃
merical simulation and engineering measurement. The research reveals the influence of underlying coal
seam mining on coal seam integrity and roadway stability,and determines the repair time of upper coal seam
roadway and the reasonable position of open-off cut of lower coal seam working face. During the mining peri⁃
od of the coal mine,due to the influence of the mining of the underlying coal seam working face,the plastic
damage of the upper mining rock layer is serious. Although there is no step error,there is overall subsid⁃
ence. The repair time of the upper coal seam roadway should be after the plastic zone tends to be stable. The
repair time of the upper coal seam roadway should be obvious in the plastic zone,that is,the initial stage of
severe deformation of the surrounding rock. The position of open-off cut should consider the minimum defor⁃
mation of surrounding rock and the full utilization of coal resources. The field engineering application shows
that after taking the above measures,the deformation of roadway surrounding rock meets the requirements of
coal mine production,and the multiple repairs of roadway surrounding rock deformation are avoided.

Key words: