现代矿业 ›› 2020, Vol. 36 ›› Issue (4): 161-164.

• 安全·职业健康 • 上一篇    下一篇

泥质软岩巷道破坏机理分析与控制技术

刘宁1,王少勇2,周发陆1,魏海涛1,夏德威1,张小刚1   

  1. 1.伽师县铜辉矿业有限责任公司;2.北京科技大学土木与资源工程学院
  • 出版日期:2020-04-25 发布日期:2020-05-20
  • 基金资助:

    *新疆维吾尔自治区区域协同创新专项(科技援疆计划)(编号:2017E0218)。

Failure Mechanism Analysis and Control Technology of Argillaceous Soft Rock Roadway

Liu Ning1,Wang Shaoyong2,Zhou Falu1,Wei Haitao1,Xia Dewei1,Zhang Xiaogang1   

  1. 1.Jiashi County Tonghui Mining Co.,Ltd.;2.School of Civil and Resource Engineering, University of Science and Technology Beijing
  • Online:2020-04-25 Published:2020-05-20

摘要: 新疆拜什塔木铜矿岩体松软,遇水泥化,巷道易发生片帮、底鼓等破坏,返修率高达70%以上。为实现软岩巷道安全高效支护,通过调研并分析了巷道破坏形式,开展了巷道岩体力学参数与水理性质测试,揭示了泥质软岩巷道破坏机理,提出以树脂锚杆+钢筋网+喷射混凝土为核心的主动定向支护新方法,并在考虑围岩质量、巷道断面、应力环境、服务年限的基础上,形成了破碎软岩巷道分区、分级、分时支护方案。新支护方案应用后,巷道平均变形量降低20%,变形速率由原来的3.3 mm/d降低至0.6 mm/d,大大降低返修项成本,巷道掘进成本降低14%,经济效益显著。拜什塔木铜矿软岩巷道采用分区、分级、分时支护方案,巷道稳定性显著提高,大大降低巷道维护成本,确保了矿山安全生产。

关键词: 泥质软岩, 破坏机理, 锚网喷支护, 分区, 分级, 分时

Abstract: The rock mass of Baishitamu Copper Mine in Xinjiang is soft and argillaceous,the roadway is prone to damage such as rib spalling and floor heave,the repair rate is as high as 70%.In order to realize safe and efficient support of soft rock roadway,roadway failure forms were investigated and analyzed,the mechanical parameters and hydrologic properties of roadway rock mass were tested,the failure mechanism of argillaceous soft rock roadway was revealed,a new active directional support method with resin bolt,steel mesh and shotcrete was adopted.Considering surrounding rock quality,roadway section,stress environment and service life of roadway,the zoning,grading and time-sharing support scheme for the broken soft rock roadway of Baishtamu Copper Mine was formed.The actual application results show that the roadway deformation is reduced by 20% and the deformation rate is reduced from 3.3 mm/d to 0.6 mm/d by using new support scheme.The repair cost is greatly reduced,and the roadway excavation cost is reduced by 14%,the economical benefits are significant.The above study results further indicate that the zoning,grading and time-sharing support scheme proposed in Baishtamu Copper Mine in this paper could help for improving the roadway stability,reducing the roadway repair costs and guaranteeing the safety production of the mine.

Key words: Argillaceous soft rock, Failure mechanism, Bolt-mesh-shotcrete, Zoning, grading and time-sharing support