河南陈四楼煤矿二十采区准备巷道优化布置方案

宋成义   

  1. 永城煤电控股集团有限公司陈四楼煤矿
  • 出版日期:2018-02-24 发布日期:2018-03-21

Optimization Layout Scheme of Preparatory Roadway of No.20 Mining Area  of Chensilou Coal Mine in Henan Province

Song Chengyi   

  1. Chengsilou Coal Mine,Yongcheng Coal and Electric Power Holding Group Co.,Ltd.
  • Online:2018-02-24 Published:2018-03-21

摘要: 由于矿井开采深度逐年增加,井下水文地质条件日趋复杂,各生产系统环节逐渐增多,进而导致采掘失衡。对采区巷道布置方案进行优化,有助于减少采区准备阶段岩巷工程量,尽快形成采区生产系统。以河南省陈四楼煤矿北翼二十采区准备巷道为例,在确保采区各生产系统符合相关规定的前提下,优化了采区准备巷道布置方案,通过对胶带集中巷与轨道集中巷采用“机轨合一”的布置方式,将巷道断面设计成直墙半圆拱型式,并采用锚网喷+锚索支护工艺对巷道围岩进行稳定性控制,实现了连续化集中生产,既能满足采区运输系统的需要,又能节省采区准备巷道工程量、降低前期成本投入、缩短采区准备工期并提前满足采区工作面的回采条件,从而达到缓解矿井采掘接替紧张的目的。

关键词: 深井开采, 准备巷道, 集中巷, 优化布置, 巷道支护

Abstract: With the increasing of mining depth of coal mine,the underground hydrogeologial conditions are becoming more complex increasingly,the underground production system is also increased gradually,which make the underground mining and drivage become unbalance.The optimization of roadway layout scheme is help for decreasing the rock roadway drivage engineering,so as to form the production system of mining area as soon as possible.Taking the preparatory roadway of No.20 mining area of Chensilou Coal Mine in Henan Province as the study example,under the premise of the underground production system in conformity with the provisions in the mining area,the layout scheme of preparatory roadway of the mining area is optimized,the layout scheme of consolidation of conveyor transportation roadway and railway transportation roadway is proposed to deal with conveyor concentrated roadway and railway concentrated roadway,the roadway section is designed as straight wall semicircle arch shape,and the supporting technique of spray anchor net and anchor cable is used to ensure the stability of roadway surrounding rock.The goal of continuous concentrated production,it can not only meet the requirement of transportation system in mining area,but also is help for decreasing the roadway drivage engineering in mining area,reducing upfront costs,shortening the preparatory engineering period of mining area and meeting the stoping conditions of the working face of mining area,so as to realize the goal of relieving the tension state of mining and drivage works of Chensilou Coal Mine.

Key words: Deep mining, Preparatory roadway, Concentrated roadway, Optimization layout, Roadway supporting