欢迎访问《现代矿业》杂志官方网站,今天是 分享到:

现代矿业 ›› 2014, Vol. 30 ›› Issue (07): 6-9.

• 采矿·矿物加工 • 上一篇    下一篇

大直径深孔嗣后充填法采场结构优化的数值模拟

李安平,刘洋树,周明   

  1. 新疆阿舍勒铜业股份有限公司
  • 出版日期:2014-07-15 发布日期:2015-08-18

Numerical simulation on the Optimization of Stope Structure of Large-diameter Long Hole Afterwards Backfilling Mining Method

Li Anping,Liu Yangshu,Zhou Ming   

  1. Xinjiang Asele Copper Company Limited
  • Online:2014-07-15 Published:2015-08-18

摘要: 针对新疆阿舍勒铜矿开采技术条件,采用Ansys有限元软件,对采场跨度为10,12,13,15 m时的围岩应力、位移变化规律进行了数值计算分析。结果显示,采场跨度是影响其稳定性的重要因素,在现有条件下,采场跨度在13 m以上是不稳定的,计算结果、相似模拟实验结果及开采实践对比分析表明,采场最佳跨度为8~12 m。

关键词: 数值计算, 采场结构优化, VCR法

Abstract: According to the mining technical conditions of Asele copper mine,the Ansys software is adopted to calculate and analyze the stress and displacement change rule of the stope wall rocks with various spans of 10,12,13,15 m.The research results show that,stope span is the important factor which influences the stability of stope.Under the existing condition,if the stope span is above 13 m,it will be not remain stable,therefore,the optimal value of stope span is from 8 m to 12 m.

Key words: Numerical calculation, Optimization of stope structure, VCR mining method