尾砂胶结充填法对地表建筑设施稳定性影响分析

党高锋,张子超,杨玉学   

  1. 中钢集团工程设计研究院有限公司
  • 出版日期:2013-08-15 发布日期:2013-10-14

Analysis on the Impact of Backfilling Cementation Filling Method on the Stability of the Surface Buildings

Dang Gaofeng,Zhang Zichao,Yang Yuxue   

  1. Sinosteel Engineering Design & Research institute Co.,Ltd.
  • Online:2013-08-15 Published:2013-10-14

摘要: 采用大型有限元模拟软件对矿山开采充填过程进行三维仿真模拟计算,数值模拟结果与现场实测数据基本相符,其地表变形的主要技术指标小于建筑物Ⅰ级变形的要求,证明采用尾砂胶结充填采矿法开采后造成的地表位移对地面建筑设施影响不大,可以保证地表建筑设施的稳定性。

关键词: 有限元软件, 数值模拟, 地表位移, 稳定性

Abstract: Mining filling process is three dimensional simulation calculated by finite element simulation software. The results of numerical simulation is the same with the field measured data. The main technical index of the ming surface deformation is less than the I level building deformation. The impact of the surface displacement after backfilling mining cemented filling mining method on the ground building facilities is not tremendous. The stability of the surface structures can be guaranteed.

Key words: Finite element software, numerical simulation, The surface displacement, Stability