基于Ansys露井联采条件下采空区覆岩合理厚度的确定

费鹏程,宋子岭,王东,王瑞雪   

  1. 辽宁工程技术大学矿业学院
  • 出版日期:2012-01-11 发布日期:2012-01-11

Research on the Reasonable Thickness of Cover Layer at Goaf under Condition of Open-underground Combined Mining based on Ansys

Fei Pengcheng,Song Ziling,Wang Dong,Wang Ruixue   

  1. Mining Institute, Liaoning Technical University
  • Online:2012-01-11 Published:2012-01-11

摘要: 露井联合开采条件下的采空区上覆岩层的稳定性一直是采矿工程技术中的关键问题。采用KB鲁佩涅依特理论估算法、结构力学梁理论计算法、普氏拱理论估算法与数值模拟法,对鄂尔多斯某矿进行分析计算,对不同采空区跨度及顶板厚度进行数值模拟,通过多种计算方法与实际生产状况结合,得出不同采空区跨度下合理的覆岩最小安全厚度值,为矿山设计合理采空区覆岩厚度提供了参考,对露井联合开采安全生产具有重要意义。  

关键词: 露井联采, 合理顶板厚度, 采空区跨度, 最大拉应力

Abstract: Stability of overlying strata at goaf under condition of open-underground combined mining had been a key issue in mining engineering technology. Practice situation of a mine in Ordos were analyzed and calculated by using KB LuPeinie theory estimation method, structural mechanics theory calculation method, Platts arch theory estimation method and numerical simulation method, numerical simulation was done on different goaf span and top plate thickness, though combine of several calculating methods and practice production situation, reasonable minimum safe thickness value of overlying strata at different goaf span was obtained, provided reference for reasonable goaf overlying strata thickness design of mine, had important guiding significance for safe production of open-underground combined mining.

Key words: Open-underground combined mining, Reasonable top plate thickness, Goaf span, Maximum tensile stress