欢迎访问《现代矿业》杂志官方网站,今天是 分享到:

现代矿业 ›› 2011, Vol. 27 ›› Issue (1): 22-25.

• 采选工程 • 上一篇    下一篇

大冶灵宝铁矿采场稳定性综合分析评价

张青青,欧阳治华,陈平,龚剑   

  1. 武汉科技大学资源与环境工程学院
  • 出版日期:2011-01-21 发布日期:2011-01-21

Comprehensive Analysis and Evaluation of Stope Stability in Daye Lingbao Iron Mine

Zhang Qingqing,Ouyang Zhihua,Chen Ping,Gong Jian   

  1. College of Resources and Environment Engineering,Wuhan University of Science and Technology
  • Online:2011-01-21 Published:2011-01-21

摘要:  采用RMR及Q系统岩体分类方法对灵宝铁矿采场整体稳定性进行分析,并运用ANSYS软件综合评价采场细部稳定性数值分析的结果及该矿采场的稳定性。分析得出该矿在当前条件下采场稳定性良好,为安全回采矿区残留矿体提供了理论依据。

关键词: RMR, Q系统, 三维有限元, 数值模拟, 稳定性

Abstract: The global stability of Lingbao iron mine stope was analysis by RMR method and Q-system rock mass classification methods, and the results of numerical analysis on the details of stope stability and stabilty of this stope are evaluated comprehensively using ANSYS software. Stope stability of this mine is good on the current conditions, and it provides theoretical foundation for the safe stoping of ore remained in mining area.

Key words: RMR, Q system, 3D FEM, Numerical simulation, Stability