现代矿业 ›› 2019, Vol. 35 ›› Issue (09): 81-83.
• 采矿工程 • 上一篇 下一篇
柳波1,2
出版日期:
发布日期:
Liu Bo1,2
Online:
Published:
摘要: 目前利用矿业软件进行地质建模越来越广泛。针对建模方法及成果多种多样,数据不统一、不规范,无法实现储量动态管理的问题,分析了三维地质模型的种类及特点,提出了基于三维地质模型的标准先行、模型动态更新、协同设计、生产执行管理的建设思路,从而实现矿产资源储量三维动态管理。
关键词: 矿产资源, 三维地质模型, 空间数据, 储量动态管理, 矿业软件
Abstract: At present,geological modeling by mining software is more and more widely used.Aiming at the problems of various modeling methods and results,inconsistent and non-standard data,and unable to realize dynamic management of reserves,the types and characteristics of three-dimensional geological model are analyzed.the construction ideas of standard first,model dynamic updating,collaborative design and production execution management based on three-dimensional geological models are put forward.And then realizing three-dimensional dynamic management of mineral resources reserves.
Key words: Mineral Resources, Three-dimensional geological model, Spatial data, Reserve dynamic management, Mining software
柳波. 矿产资源储量动态管理的三维地质建模方法[J]. 现代矿业, 2019, 35(09): 81-83.
LIU Bo. Three-dimensional Geological Modeling Method for Dynamic Management of Mineral Resources Reserves[J]. Modern Mining, 2019, 35(09): 81-83.
0 / / 推荐
导出引用管理器 EndNote|Ris|BibTeX
链接本文: http://www.xdky.net/CN/
http://www.xdky.net/CN/Y2019/V35/I09/81