现代矿业 ›› 2014, Vol. 30 ›› Issue (09): 8-9+12.
• 采矿工程 • 上一篇 下一篇
孙红发,黄桂,冉玉玺,孙远方
出版日期:
发布日期:
Sun Hongfa,Huang Gui,Ran Yuxi,Sun Yuanfang
Online:
Published:
摘要: 对上湾矿已采12106工作面矿压进行了实测分析,根据该工作面顶板岩层特点,计算并构建了该顶板运动参数及结构模型,为该矿新开12401工作面矿压规律的分析提供了基础数据。
关键词: 12106工作面, 顶板运动参数, 顶板结构模型
Abstract: The measured pressure in working face 12106 in Shangwan coal mine is analyzed,the roof movement parameters are calculated based on the characteristics of working face 12106.Besides that,the roof structure model of 12106 working face is established.The above research results can provide foundation data for predicting the mine pressure regularity of the new 12401 working face.
Key words: 12106 working face, Roof movement parameters, Roof structure model
孙红发, 黄桂, 冉玉玺, 孙远方. 上湾矿12106工作面顶板运动参数计算及结构模型的确定[J]. 现代矿业, 2014, 30(09): 8-9+12.
SUN Hong-Fa, HUANG Gui, RAN Yu-Xi, SUN Yuan-Fang. Calculation of Roof Movement Parameters and Determination of Roof Structure Model of Working Face 12106 in Shangwan Coal Mine[J]. Modern Mining, 2014, 30(09): 8-9+12.
0 / / 推荐
导出引用管理器 EndNote|Ris|BibTeX
链接本文: http://www.xdky.net/CN/
http://www.xdky.net/CN/Y2014/V30/I09/8