现代矿业 ›› 2014, Vol. 30 ›› Issue (09): 10-12.
• 采矿工程 • 上一篇 下一篇
陈爱喜1,王鹏2,杨长德2
出版日期:
发布日期:
Chen Aixi1,Wang Peng2,Yang Changde2
Online:
Published:
摘要: 为确定察哈素煤矿3103工作面连续采煤机掘进巷道空顶距的合理长度,根据测量仪器观测数据的分析研究,最终得出掘进巷道合适空顶距为7.3 m。克服了空顶距选择的盲目性,实现了空顶距选择的定量分析,保证了巷道掘进的速度和安全性,为煤矿高效生产提供了指导。
关键词: 巷道掘进, 空顶距, 连续采煤机
Abstract: Aiming at the reasonable length of empty zenith distance of continuous miner in 3103 Chahasu coal mine, the measuring instruments observed datas are analyzed, so, the final determination of reasonable empty zenith distance of drivage roadway is 7.3 m. The research results overcome the blindness of selection of empty zenith distance so as to conduct quantitative analysis on the selection of empty zenith distance and ensure that the speed and security of roadway drivage. Besides that, the above research results can provide some reference for the efficient production of coal mine.
Key words: Roadway drivage, Empty zenith distance, Continuous miner
陈爱喜, 王鹏, 杨长德. 察哈素煤矿掘进工作面合理空顶距的确定[J]. 现代矿业, 2014, 30(09): 10-12.
CHEN Ai-Xi, WANG Peng, YANG Chang-De. Research Method on the Tunneling Face Legitimate Roof Distance in Chahasu Coal Mine[J]. Modern Mining, 2014, 30(09): 10-12.
0 / / 推荐
导出引用管理器 EndNote|Ris|BibTeX
链接本文: http://www.xdky.net/CN/
http://www.xdky.net/CN/Y2014/V30/I09/10