现代矿业 ›› 2013, Vol. 29 ›› Issue (05): 8-10+35.
• 采选工程 • 上一篇 下一篇
陈五九
出版日期:
发布日期:
Chen Wujiu
Online:
Published:
摘要: 无底柱分段崩落法在和睦山铁矿开采过程中遇到通风困难、爆破效果差、巷道变形严重、回收率低等诸多问题。从5个方面提出了改进和优化措施,对结构参数和生产工艺等进行调整,取得了很好的效果。
关键词: 无底柱分段崩落法, 应用, 优化
Abstract: Many problems like difficult in ventilation, poor blasting effect, serious deformation of roadway, low recovery rate existed in mine process of Hemushan Iron Ore by non-pillar sublevel caving. Improvement and optimization measures were proposed from five aspects, adjustments were done on structure parameters and production technology and so on, good effect obtained.
Key words: Non-pillar sublevel caving, Application, Optimization
陈五九. 无底柱分段崩落法在和睦山铁矿的应用与优化[J]. 现代矿业, 2013, 29(05): 8-10+35.
CHEN Wu-Jiu. Application and Optimization of Non-pillar Sublevel Caving at Hemushan Iron Ore[J]. Modern Mining, 2013, 29(05): 8-10+35.