欢迎访问《现代矿业》杂志官方网站,今天是 分享到:

现代矿业 ›› 2012, Vol. 28 ›› Issue (12): 7-11.

• 采选工程 • 上一篇    下一篇

寺河矿厚层综采工作面覆岩冒裂带发育高度实测研究

霍振龙   

  1. 山西晋煤集团寺河矿
  • 出版日期:2012-12-15 发布日期:2012-12-31
  • 基金资助:

    * 国家科技计划支撑课题(编号:2012BAC10B03)。

Field Research on Developing Height of Overlying Strata Overlying Strata of Thick Layer Fully-mechanized Mining Working Face in Sihe Mine

Huo Zhenlong   

  1. Sihe Mine of Jincheng Anthracite Mining Group of Shanxi
  • Online:2012-12-15 Published:2012-12-31

摘要: 厚煤层综采工艺引起的覆岩顶板导水裂缝带发育规模直接影响防治水安全评价结果。以晋城寺河矿为例,采用冲洗液消耗量法、钻孔彩色电视观测法和RFPA数值模拟法对3#煤顶板导水裂缝带进行了深入研究,研究成果对晋城矿区类似条件的矿井具有借鉴意义。

关键词: 导水裂缝带, 厚煤层, 晋城矿区

Abstract: Devloping scale of overlying strata roof water flowing fractured zone caused by thick coal seam full-mechanized mining technique effects water control safety evaluation results directly. Taken the Sihe Mine at Jincheng as an example, research was done on 3# coal roof water flowing fractured zone by using consumption of rinsing liquid method, drill hole colour television observation method and RFPA. The research results provide reference significance for mine of similar condition in mining area of Jincheng.

Key words: Water flowing fractured zone observation, Thick coal seam, Mining area of Jincheng