欢迎访问《现代矿业》杂志官方网站,今天是 分享到:

现代矿业 ›› 2012, Vol. 28 ›› Issue (10): 11-14.

• 采选工程 • 上一篇    下一篇

基于3DMine软件的露天矿开采设计

钟德云,胡柳青,吴国栋   

  1. 福州大学紫金矿业学院
  • 出版日期:2012-10-15 发布日期:2012-11-09
  • 基金资助:

    *福州大学科技发展基金(编号:2009-XQ-34)。

Open-pit Mine Exploitation based on 3DMine Software

Zhong Deyun,Hu Liuqing,Wu Guodong   

  1. College of Zijin Mining, Fuzhou University
  • Online:2012-10-15 Published:2012-11-09

摘要: 以多宝山铜矿为例,利用矿山已有数据建立矿山三维模型,进行露天境界优化、采场设计、编制采剥计划。建立了露天生产可视化管理系统,能够有效地指导采掘计划的编制和生产管理工作,并以工程实际应用情况分析了建模结果的可行性和科学性,在数字矿山架构的基础上,探讨了露天矿的可视化开采方案,为数字矿山的建设提供了有效的集成系统。

关键词: 可视化管理, 采剥计划, 3Dmine, 露天生产

Abstract: Took Duobaoshan Copper Mine as a example, 3d mine model was established by using mine existing data, open pit limit optimization, stope design and stripping plan compilation were done, open pit mining visual management system was built, which would effectively direct the compilation of mining plan and production management, feasibility and scientific of modeling results were analyzed based on engineering practical application. On the basis of digital mine structure, visual solve scheme of open-pit mine was discussed, provided effective integrated system for construction of digital mine.

Key words: Visual management, Stripping plan, 3D mine, Open pit